Gainsborough Avenue, San Diego, California 92129

Price: $187,000

Status: Completed

1 Bed
1 Bath
499 ft2

A quaint, 500sqft ADU, this unit was built for the property-owner's mother to reside in. The floor plan is totally custom, ensuring the ADU fulfills the owner's wishes down to the smallest detail. It features only one bedroom and one bathroom, keeping the plan as open and airy as possible.

Floor Plan:

PRADU 1BR/1BA 36×14 Long

For a better value, see SnapADU's improved version of a 1BA/1BA 495 sqft plan.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 20+ days (as of September 2022). This process include a pre-screen and plan check fee component before plans will be reviewed, and the overall permitting timeline is currently expected to be 6-8 calendar months for permitting. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone, which may add additional time and cost to the permitting process.

Floor Plan:

PRADU 1BR/1BA 36×14 Long

For a better value, see SnapADU's improved version of a 1BA/1BA 495 sqft plan.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 20+ days (as of September 2022). This process include a pre-screen and plan check fee component before plans will be reviewed, and the overall permitting timeline is currently expected to be 6-8 calendar months for permitting. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone, which may add additional time and cost to the permitting process.