Grape Street, San Diego, California

Price: $450

Status: Design

1 Bed
1 Bath
578 ft2

Floor Plan:

SnapADU 1BR/1BA 29×17 Long

Perfect for a small rental for income or for someone in your family, this one bedroom unit features an open concept.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 20+ days (as of September 2022). This process include a pre-screen and plan check fee component before plans will be reviewed, and the overall permitting timeline is currently expected to be 6-8 calendar months for permitting. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone, which may add additional time and cost to the permitting process.

Floor Plan:

SnapADU 1BR/1BA 29×17 Long

Perfect for a small rental for income or for someone in your family, this one bedroom unit features an open concept.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 20+ days (as of September 2022). This process include a pre-screen and plan check fee component before plans will be reviewed, and the overall permitting timeline is currently expected to be 6-8 calendar months for permitting. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone, which may add additional time and cost to the permitting process.