Tipton Street, San Diego, California 92115

Price: $350,000

Status: Design

3 Bed
3 Bath
1,195 ft2

Floor Plan:

Two-Story 3BR/2BA | 1st Floor BR 2nd Floor 2BR1BA

Three generously sized bedrooms max out ADU size limits in this plan just under 1200 sqft. A first floor bath and bedroom/office offer flexibility, while two large bedrooms and bath upstairs complete the guest house.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 40+ days (as of April 2022). This process include a pre-screen and plan check fee component before plans will be reviewed. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone and requires a Coastal Development Permit in those areas, which may add 9-12 months to the permitting process and a cost of $16,500 for the development permit.

Floor Plan:

Two-Story 3BR/2BA | 1st Floor BR 2nd Floor 2BR1BA

Three generously sized bedrooms max out ADU size limits in this plan just under 1200 sqft. A first floor bath and bedroom/office offer flexibility, while two large bedrooms and bath upstairs complete the guest house.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 40+ days (as of April 2022). This process include a pre-screen and plan check fee component before plans will be reviewed. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone and requires a Coastal Development Permit in those areas, which may add 9-12 months to the permitting process and a cost of $16,500 for the development permit.