East Falls View Drive, San Diego, California 92115

Price: $350,000

Status: Design

4 Bed
2 Bath
1,199 ft2

Floor Plan:

Two-Story 4BR/2BA | 1st Floor BR 2nd Floor 3BR1BA

With four bedrooms, this large two-story ADU of ~1200 sqft is a great option for landlords. A first floor bath and bedroom/office offer flexibility, while three bedrooms and bath upstairs complete the guest house.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 40+ days (as of April 2022). This process include a pre-screen and plan check fee component before plans will be reviewed. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone and requires a Coastal Development Permit in those areas, which may add 9-12 months to the permitting process and a cost of $16,500 for the development permit.

Floor Plan:

Two-Story 4BR/2BA | 1st Floor BR 2nd Floor 3BR1BA

With four bedrooms, this large two-story ADU of ~1200 sqft is a great option for landlords. A first floor bath and bedroom/office offer flexibility, while three bedrooms and bath upstairs complete the guest house.

Community:

San Diego

Our quick take on San Diego: Moderately ADU-Friendly


SnapADU has permitted or is in the process of permitting numerous projects within the City of San Diego. As such, we know the city's regulations and processes very well. Turnaround times at the city are protracted right now, with the intake process alone taking 40+ days (as of April 2022). This process include a pre-screen and plan check fee component before plans will be reviewed. San Diego requires digital submissions which helps keep costs and permit turnaround times down. Also, some of San Diego is in the coastal zone and requires a Coastal Development Permit in those areas, which may add 9-12 months to the permitting process and a cost of $16,500 for the development permit.