ADU Design Build: The Right Approach for Your ADU project?

Sep 28, 2024 | 0 comments

When planning an Accessory Dwelling Unit (ADU) project, navigating the design and construction phases can be complex. This guide breaks down the ADU design build process, where a single company manages both design and construction under one contract. We’ll explore the key benefits of this approach, compare it to traditional project delivery methods, and highlight the potential downsides. Whether you’re curious about how a design-build contractor operates or looking for tips on choosing the right local firm, this guide covers everything from initial feasibility studies to final inspections for your ADU design build project.

What is ADU Design Build?

ADU design build is an approach where a single company manages both the design and construction of an accessory dwelling unit (ADU). This integrated project delivery method simplifies the process for homeowners by offering a one-stop solution from concept to completion of the ADU project. The design-build method ensures smoother communication and a more efficient workflow, which is particularly important for the unique challenges of ADU projects, such as zoning, permitting, and space constraints, as well as the intersection of state and local laws.

Definition of Design Build in Construction

In construction, Design Build is a project delivery method where a single company handles the design, pre-construction and construction phases. From creating the initial plans to completing the build, a single firm handles the entire project. A design build approach consolidates the planning, pre-construction and building processes under one contract, allowing for better coordination. For clients, engaging with one entity from start to finish increases accountability, reduces the risk of miscommunication, and often minimizes unexpected changes or delays that can drive up costs.

How a Design Build ADU Contractor Differs from Other ADU Companies

A design-build ADU contractor consolidates the roles of both architect and contractor into one cohesive service. Unlike traditional models where you might hire an architect or drafter to design the ADU plans and a separate contractor to build it, design build contractors manage the entire process themselves.

Design build ADU contractors not only create and submit the ADU plans for approval but also conduct essential studies upfront. Feasibility Studies include detailed site evaluations and utility mapping to avoid common pitfalls during construction. This proactive planning during pre-construction ensures that the project runs smoothly and minimizes delays. The result is a more efficient, predictable, and streamlined ADU project.

Benefits of Hiring a Design Build Contractor for Your ADU Project

When planning an ADU project, hiring a design build contractor offers a range of benefits that can streamline the process, improve efficiency, and help you stay within budget. Let’s explore the key advantages of working with a design build firm for your ADU project.

Streamlined Communication Between Design and Construction

One of the primary advantages of the design-build approach is the seamless communication between the design and construction teams. With one firm managing both aspects, you avoid miscommunication and conflicting priorities that can arise when working with separate architects and builders. This streamlined collaboration helps reduce project delays, ensuring that everyone is aligned on the project’s goals from the start.

Faster Overall Project Timelines

Integrated planning between design and build phases often results in faster project timelines. Since the design and construction teams are working together from day one, there is no need to hand off plans to another contractor, shortening the permitting and construction process. Design build contractors are able to identify potential issues early on, keeping the project moving smoothly and allowing for quicker ADU completion.

Read more about how long it takes to build an ADU.

Budget Management and Cost Efficiency

Keep in mind that the construction costs are 85-90% of the total cost to design, permit & build an ADU. Hiring a design build contractor can help you manage those costs in a way an architect alone typically cannot. When a single firm handles both design and construction, they actively manage your budget at every stage of the project. This integrated approach provides more accurate cost estimates upfront and helps minimize cost overruns by anticipating challenges that might otherwise go unnoticed until construction begins. By working to understand the “all-in” costs early on, design-build contractors can provide realistic expectations and avoid unnecessary surprises down the line. This level of planning ensures that projects stay on budget and prevents costly delays.

Holistic Approach to Sitework and Utility Planning

Another key cost management benefit is that design-build contractors focus on comprehensive planning upfront. During feasibility, ADU design build firms perform utility mapping to identify existing power, water, gas, and sewage lines on the property, reducing the likelihood of unexpected issues during construction. This proactive approach saves time and money, ensuring smoother progress during the build phase.

Real-Time Market and Material Adjustments

Design build firms also offer the advantage of being closely connected to the construction world, enabling them to quickly adjust to changes in material availability or costs. As materials fluctuate in the market, design-build contractors can incorporate these shifts into the project plan, helping to avoid delays and cost increases. This real-time adjustment helps ensure the project stays on track and within budget.

Accountability and Single Point of Contact

A major benefit of working with a design-build contractor is the accountability that comes from having one team handle the entire project. Rather than managing multiple contacts, you’ll have a single point of contact responsible for delivering both the design and build phases of the ADU. This helps reduce stress, improve communication, and ensures that your vision is brought to life consistently from concept to completion.

ADU design build companies remain accountable for the entire project outcome. Our design fees include multiple rounds of revisions, which means we take full responsibility for ensuring your plans are approved and permitted efficiently.

Potential Downsides of an ADU Design Build Approach

While hiring a design build contractor for your ADU project can streamline the process and offer several advantages, there are some potential downsides worth considering. Below are a few areas where the design-build model may not be the best fit for every homeowner.

Less Design Flexibility

Since design and construction are handled by the same company, homeowners may have fewer opportunities to explore multiple design options. A design-focused architect may offer more creative or custom solutions that might not be prioritized in a design-build setup. Because the design-build contractor is responsible for both the design and the build, there is often a tendency to steer design decisions toward construction efficiency, which can limit opportunities for personalization or unique architectural features. While this approach can be more practical and cost-effective for many homeowners, those seeking highly customized ADU designs may find it restrictive. However, for cost-conscious homeowners, this focus on construction execution can be a positive, ensuring the project stays within budget and on schedule.

Limited Bidding Process

One of the major trade-offs of a design-build approach is the lack of competitive bidding for various aspects of the project. In a traditional setup, homeowners can hire an architect to complete the design and then bid the project out to multiple contractors, potentially securing a lower price on the build. With design-build, everything is consolidated under one contract, which means there’s no opportunity to shop around for different contractors. This may result in less competitive pricing on individual components of the project. However, the streamlined process often offsets this drawback by reducing confusion, missed details, or unexpected scope changes that can lead to cost increases down the road. Additionally, ensuring critical pre-construction tasks like utility planning are properly managed can be more challenging when working with separate architects and builders.

Not Suitable for DIY Types

Design build companies usually manage the entire process, which can be a drawback for homeowners who prefer a more hands-on approach. If you enjoy being involved in finding subcontractors, managing schedules, or making day-to-day project decisions, the all-in-one nature of design-build may not be a good fit. These firms generally take care of everything from start to finish, leaving little room for DIY project management. For homeowners who prefer to oversee parts of the build themselves or want to be more involved in the selection of contractors, a design-build model may feel overly restrictive. However, some design build ADU companies offer white box / ADU shell options, allowing you to take the project through drywall, giving you more flexibility to manage certain elements of the build yourself.

Sticker Shock

Seeing a true “all-in” cost is often surprising for homeowners who aren’t used to the design-build model. In this approach, you’re provided with a comprehensive cost upfront, which can feel like a bigger number compared to receiving separate estimates for design and construction. While the design-build model can ultimately lead to savings by preventing change orders and unexpected costs later, the upfront figure can cause initial sticker shock. The “turnkey” nature of the service often offsets this, as it includes warranties that smaller contractors typically don’t prioritize. While the added peace of mind comes at a higher price, it delivers long-term value by ensuring the project is completed without unforeseen complications.

ADU Design and Build Services in San Diego

When embarking on an ADU project in San Diego, it’s important to choose the right team to handle both the design and construction phases. A design-build approach offers a single point of accountability while ensuring your project adheres to San Diego’s unique regulations and requirements.

Why Choose a Local Design Build Contractor in San Diego

When building an ADU in San Diego, choosing a local design build contractor offers distinct advantages over working with a more general or out-of-area ADU consultant. San Diego’s ADU regulations, zoning laws, and permitting processes are unique, and a local contractor brings critical, area-specific knowledge to ensure your project runs smoothly from start to finish.

Familiarity with San Diego’s ADU Regulations and Zoning Laws

San Diego has specific rules governing accessory dwelling units, from zoning restrictions to parking requirements and setback regulations. A local design-build contractor will have in-depth knowledge of these local regulations and how they apply to your property. They will also stay up-to-date on changes in local ADU laws, such as SB9 and AB 1033, ensuring your project meets all legal requirements.

A local contractor’s familiarity with these nuances can prevent costly delays that might arise from non-compliance, and they can provide guidance on what’s feasible within your neighborhood’s zoning regulations. Whether it’s understanding local fire requirements, coastal zones, or even navigating historic district rules, a local contractor will know how to avoid potential pitfalls.

Relationships with Local Inspectors and Permit Offices

Local design build contractors work closely with San Diego’s building departments and inspectors, giving them a better understanding of what specific officials are looking for during the permitting and inspection phases. These established relationships can help smooth the process, ensuring fewer roadblocks and faster project approvals.

In addition, a local contractor’s ongoing interactions with inspectors allow them to anticipate concerns and address them proactively during the design phase. This inside knowledge of what inspectors commonly flag can lead to fewer revisions, reduced permitting delays, and a more streamlined path to breaking ground.

“You guys do such a wonderful job with attention to detail on your Construction, ADU projects and your paperwork administration level is out of this world. I really appreciate all your employees, work ethics, and really nice kind people to work with. You guys definitely lead the way on how Construction projects should run in the field and internally behind the scenes. Thank you so much.” – Building Inspector, City of Carlsbad

Local Experience with ADU Projects

Design build companies in San Diego will have the knowledge to navigate the complexities of working with SDG&E (San Diego Gas & Electric). This includes utility connections, electrical panel upgrades, and coordination with local service providers to ensure your project meets energy requirements efficiently. They can also advise on the best approach to integrating ADUs into existing landscapes, using exterior designs that align with the neighborhood’s architectural style.

San Diego has unique challenges and opportunities for ADU construction. This includes sloped lots, small lot sizes, and some properties on septic. A local design-build contractor with experience building ADU projects in the area will be able to anticipate these challenges and design solutions tailored to the specific needs of San Diego properties.

Understanding of the San Diego Market and Cost Expectations

Local contractors are more in tune with the specific cost trends and market conditions in San Diego. They will have realistic expectations of labor costs, material prices, and the overall construction budget. This knowledge helps them provide more accurate estimates upfront, minimizing the risk of budget overruns later on.

A locally-based contractor will also have established relationships with local suppliers and subcontractors, ensuring timely delivery of materials and services. This not only helps keep your project on schedule but also can reduce costs and reduce delays. They will also know which materials are best suited for San Diego’s climate and environment, providing long-term durability for the exterior of your ADU.

Overall Costs of ADU Design Build Approach in San Diego

A design-build approach may present a higher upfront quote. However, it typically leads to fewer surprises. The streamlined communication between the design and construction teams helps prevent unexpected scope changes and delays, which often result in cost increases in other delivery methods.

With transparent pricing and detailed contracts, design-build services help homeowners avoid hidden costs. These contractors manage the entire project under one roof, accounting for every aspect of the build, from utility mapping to permitting and sitework. They provide a clear picture of the total project cost from the start, reducing the likelihood of costly mid-project adjustments. This transparency makes the design-build approach more predictable and cost-effective overall.

Design Build ADU Process: How It Works

The design-build process for an ADU includes every step of your project, from the initial design concept to the final construction. Here’s a breakdown of how the design-build process typically works:

Initial Consultation and Feasibility Study

The first step in a design build ADU project is the discovery process, followed by a detailed proposal. Some companies will also provide an initial assessment of feasibility as part of the initial consultations. Typically, a more extensive feasibility study is the first phase of paid work. During this phase, the design-build contractor will assess your property to determine the best approach for building your ADU.

A comprehensive feasibility study is essential for identifying potential challenges upfront, such as zoning restrictions, lot constraints, and utility access. This study includes elements like:

  • Utility mapping to locate power, water, gas, and sewage lines. By understanding the existing infrastructure, the contractor can plan around any obstacles and ensure that the ADU has proper connections without running into costly surprises once construction begins.
  • Site evaluation, which looks at factors like the size and slope of the lot, property setbacks, and any existing structures that may affect the ADU design. This step helps the contractor determine what is feasible within your property’s constraints.
  • Budget planning to ensure the project aligns with your financial expectations. By evaluating all potential costs upfront, including site preparation, materials, and labor, the contractor can provide a realistic estimate before moving forward.

The feasibility study sets the foundation for a successful project, reducing the risk of delays and cost overruns later on.

Design and Permitting

Once the feasibility study is complete, the next step is the design and permitting phase. In this stage, the design build ADU contractor will create a design for your project based on your preferences and the property’s unique characteristics. This could include a build-ready plan or custom plan.

Design Process

Unlike traditional design approaches where you hire an architect and later find a builder, design-build contractors handle both aspects, ensuring that the design is realistic and can be built within your budget. The design process includes:

  • Assessing the buildable space and determining the optimal placement for the structure.
  • Creating floor plans and elevations that align with your vision and maximize the space available. You could choose a standard plan, or decide to opt for custom or semi-custom plans.
  • Ensuring the design adheres to city regulations and building codes, including zoning laws, setbacks, and height restrictions specific to your jurisdiction.
  • Incorporating features that fit seamlessly with your primary home, both in terms of aesthetics and functionality.

Permitting Process

Once the design is finalized, the design-build contractor manages the permitting process, submitting the necessary documents to the city for approval. This includes:

  • Submitting all required applications and fees that are specific to that jurisdiction.
  • Coordinating with local authorities to ensure the plans meet all required regulations, including passing checks by Planning Department, Building Department, Engineering Department, Fire Department and other stipulations.
  • Handling any revisions or resubmissions required during the approval process.
  • Ensuring that permits are obtained as quickly as possible by expediting in-person when needed.

By having both the design and permitting managed by the same team, homeowners experience fewer delays and roadblocks during this crucial phase of the project. Advocating for homeowners is a regular part of this process.

Construction and Project Management

The construction phase marks the start of building your ADU. Design-build contractors take full responsibility for the ADU construction process, managing all aspects from start to finish.

  • Timeline Management: The contractor creates a detailed construction schedule, outlining each step of the build to meet milestones and keep the project on track. Typically templates help ensure repeatability on each project. Design-build teams collaborate closely, and in-house project managers ensure efficient construction and adherence to deadlines.
  • Subcontractor Coordination: Design-build contractors directly manage relationships with subcontractors, such as plumbers, electricians, and framers, ensuring all work meets code requirements. This centralized approach, built on long-term relationships, prevents confusion and delays that often occur when homeowners hire subcontractors separately.
  • Material Sourcing and Management: The design-build team promptly orders necessary materials, coordinating deliveries to prevent delays. Their strong connections with local suppliers help maintain schedules and often result in better pricing on materials. They also have experience with timing deliveries to reduce interference with on-site construction activities.

Throughout the construction process, regular progress updates are provided to keep homeowners informed of any potential changes or issues. The design build company remains accountable for any challenges that arise, quickly addressing problems to minimize disruptions and ensure a smooth build.

By handling project management, materials, and subcontractors in-house, a design-build contractor streamlines the construction phase. This leads to fewer delays and a more predictable project outcome.

Final Inspection and Handover

Once construction is complete, the design build contractor will schedule a final inspection with the city to ensure that the ADU meets all safety and building standards. After passing inspection, the contractor will hand over the completed ADU, ready for use. They will also follow up on any warranty claims.

By working with a design-build contractor, you can enjoy a seamless, stress-free process, from the initial consultation through to the final inspection. The design-build approach minimizes risk, reduces delays, and provides a clear path from concept to completion for your San Diego ADU project.

Still considering options? Read more about What to Look for in a Reliable ADU Company in San Diego.

Search ADU Plans

Size of unit:

0 sq. ft.
-
1200 sq. ft.

Beds:

Any

Baths:

Any

Stories:

Any
About Maxable

About SnapADU

Since 2020, we’ve focused exclusively on designing, permitting, and building over 100 ADUs in San Diego. Our deep experience means we catch what others might miss, and our in-house team ensures every promise is delivered.

Learn More

Learn more on this topic

Related Blog Posts

All About ADUs with Garages

All About ADUs with Garages

Adding an accessory dwelling unit (ADU) with a garage can take several forms, from an above-garage ADU (also called a carriage house) to an ADU with an attached garage next to it, or a garage conversion that transforms an existing structure into livable space. Whether...

Stormwater Management for Accessory Dwelling Units

Stormwater Management for Accessory Dwelling Units

When building an accessory dwelling unit (ADU), stormwater management and erosion control are critical considerations. Proper planning helps prevent flooding, soil erosion, and water pollution. These issues that can affect not only your property but also surrounding...

Electric Panels and Service Upgrades for ADUs

Electric Panels and Service Upgrades for ADUs

Thinking about adding an accessory dwelling unit (ADU) to your property in San Diego, California? You may be wondering... does an ADU need its own electrical sub panel? You will need to add a separate utility meter for the electrical service that feeds the ADU. It’s...